Zero added headcount
Trained industry specialists take shipment tracking, dispatch, labor claims and closeout off your team's desk.
Installer services
Your workflow, end to end. We run the parts that decide how install day goes.
Avanto works the field end of the commercial interiors workflow: shipment tracking and receiving, install scheduling and dispatch, labor claims, punch list generation, and project closeout.
Trained industry specialists take shipment tracking, dispatch, labor claims and closeout off your team's desk.
Crews are scheduled against confirmed delivery dates, so nobody is sent to a site before product arrives.
Punch lists reconciled to the manufacturer and closeout packages assembled, so projects get signed off and billed.
What we run for you
Each part of the field workflow is handled by our team on top of Strata, inside the systems you already use.
We track shipments and transit, capture receipts as product lands, and file freight claims when it arrives damaged, tracking each claim through to resolution.
We coordinate install scheduling and crew dispatch against confirmed delivery dates, manage delivery coordination, and process labor claims when defective or incorrect product forces extra field labor.
We generate punch lists, reconcile each item back to the responsible manufacturer, track replacements through to arrival, and assemble the closeout package so the project can be signed off and billed.
How we help installers
Every engagement is scoped to what your team needs. Take a single service, a whole line, or all three.
Dock to closeout
Levels 1 to 3
The platform underneath
Avanto, the team that runs it
Avanto combines trained industry specialists with AI-powered automation, so the load of shipment tracking, receiving, dispatch scheduling, labor claims, and punch list closeout comes off your team's desk.
Integrations
Strata sits on top of the dealer and manufacturer platforms your jobs already run through, rather than competing with them. Shipment and receiving data flows automatically.
One connected network: Strata connects manufacturers, reps, dealers, and installers, so every partner works from the same real-time information.
The result: fewer surprise deliveries, tighter crew scheduling, faster punch closure, and cleaner closeout.
See all integrationsFree · Under 2 minutes · Instant results
A starting point, not a deep dive. In under two minutes it asks how your team handles receiving, scheduling, and closeout today, and gives you a readiness score with a personalized guide pointing at the parts of your workflow worth looking at first.
Take the assessmentQuestions
Avanto runs the field end of the workflow for installers. That covers shipment alerts and transit tracking, receiving and receipt capture as product lands, freight claims on damaged product, install scheduling and dispatch, delivery coordination, labor claim processing, punch list generation, punch item reconciliation with manufacturers, and closeout documentation.
Avanto captures receipts as product arrives and compares what landed against what was ordered. When product arrives short or damaged, Avanto files the freight claim and tracks it through to resolution, including the damage documentation carriers require. That keeps the claim moving without pulling a foreman off the job to chase paperwork.
A punch list is the record of items still outstanding after installation: damaged parts, wrong finishes, missing components, and adjustments. Avanto generates the punch list, reconciles each item back to the responsible manufacturer, tracks replacements through to arrival, and assembles the closeout package so the project can be signed off and billed.
Yes. Avanto coordinates install scheduling and crew dispatch against confirmed delivery dates, so crews are not sent to a site before product arrives. Avanto also processes labor claims, which are the reimbursement requests filed against a manufacturer when defective or incorrect product forces extra field labor.
Let's walk through your field workflow and show you exactly where Avanto plugs in, starting with the work that costs your crews the most time today.